
The Contractor for the construction
of Water Treatment Plant (WTP) is
still to award. The design and supervision
consultant has been performing all
its pre-requisites to announce the
Contract. This task consists of design,
estimation and documentation before
going for Bidding.
The work under this Contract will
include, but will not be limited to,
furnishing all labour, materials,
appurtenances, tools, equipment and
construction technology necessary
for the Melamchi Water Supply Project,
Contract No. WTP/01, Construction
of Water Treatment Plant at Sundarijal
that covers both civil and electrical/mechanical
work to construc.
Some major work under this contract
may be defined as:
 |
The connection to
the pipeline laid under the Melamchi
Diversion Scheme (MDS) from the
end of the tunnel to near the
water treatment plant; |
 |
The treatment plant which will
have an initial capacity of 170
Ml/d is designed to be extended
to 510 Ml/d. The work includes
the reception chamber, mini-hydro
power generation, distribution
chamber, flocculation basins,
sedimentation basins, filtration
units, pipe gallery, clear water
reservoir, sludge lagoons, Central
Building Complex comprising chemical
facilities, maintenance facilities
and administration facilities
and on-site pipework; |
 |
The treated water transmission
main from the treatment plant
to the connection with the bulk
distribution system (BDS);
all ancillary works including
roads and site works; and |
 |
Testing, commissioning and training
of MWSDB (or other designated)
personnel for the works under
the Contract. |
:
|