|
Environmental Impact Assessment (EIA)
|
|
|
| S.N. |
Particular |
Date |
| 1 |
EIA, WTP, MWSP |
PMC Dec. 99 |
| 2 |
Expression of interest providing consultancy services
in the field of environmental engineering & technology,
EIA EMP for your MSP |
GHOSH, BOSE June 4, 98 |
| 3 |
EIA for WTP |
Nippon Koei, Jan. 00 |
| 4 |
MWSP, EIA
Vol. 1 main report
Vol. 2 environmental management plan
Vol. 3 annexes to Vol. 1 and Vol. 2
MWSP, EIA, Executive summary |
Nippon Koei, Aug. 00
MWSDB, Aug. 00 |
| 5 |
Field study/interacton report |
IUCN Jun, 24, 94 |
| 6 |
Initial environmental examination of Yangri & Larke
extention schemes. Final draft report |
Metcon Const. Nov. 00 |
| 7 |
MDS, EIA report Inception report |
IUCN / METCON April 26, 99 |
| 8 |
MDS, EIA report (preliminary draft) |
IUCN / METCON July 16, 99 |
| 9 |
MDS, EIA report (executive summary) |
IUCN / METCON Aug. 99 |
| 10 |
MDS, EIA report (final) |
IUCN / METCON Aug. 99 |
| 11 |
MDS, EIA report (final version)
Vol. 1 (executive summary and main report)
Vol. 2 annexes |
IUCN / METCON Dec. 99 |
| 12 |
MDS, EIA annexes |
IUCN / METCON Aug. 30, 99 |
| 13 |
MDS SEIA Quarry sites (Bahunepani, Sera, Chanaute, Timbu
and Ribal) supplementary EIA report |
BPC Hydro consult March 00 |
| 14 |
MDS SEIA 33 KV transmission line (Sundarijal to Ribal)
supplementary EIA report |
BPC Hydro consult March 00 |
| 15 |
MDS SEIA Sundarijal to Gokarna 132 KV transmission line,
final report |
NEA March 00 |
| 16 |
SEIA of MDS based on stand alone water supply only |
Metcon Const. Nov. 00 |
| 17 |
Scopying report for EIA, WTP, MWSP |
MHPP/MWSDB Sep 99 |
| 18 |
Scopying report for EIA |
Nippon Koei Jan. 00 |
| 19 |
Scopying for EIA Mahankal WTP of MWSP |
MWSDB Aug. 99 |
| 20 |
TOR for EIA, WTP, MWSP |
MHPP/MWSDB Sep 99 |
| 21 |
TOR for EIA, MWSP |
Nippon Koei Jan. 00 |
| 22 |
TOR for EIA, Mahankal WTP |
MWSDB Aug. 99 |