S.N. Particular Date
1 EIA, WTP, MWSP PMC Dec. 99
2 Expression of interest providing consultancy services in the field of environmental engineering & technology, EIA EMP for your MSP GHOSH, BOSE June 4, 98
3 EIA for WTP Nippon Koei, Jan. 00
4 MWSP, EIA
Vol. 1 main report
Vol. 2 environmental management plan
Vol. 3 annexes to Vol. 1 and Vol. 2
MWSP, EIA, Executive summary
Nippon Koei, Aug. 00



MWSDB, Aug. 00
5 Field study/interacton report IUCN Jun, 24, 94
6 Initial environmental examination of Yangri & Larke extention schemes. Final draft report Metcon Const. Nov. 00
7 MDS, EIA report Inception report IUCN / METCON April 26, 99
8 MDS, EIA report (preliminary draft) IUCN / METCON July 16, 99
9 MDS, EIA report (executive summary) IUCN / METCON Aug. 99
10 MDS, EIA report (final) IUCN / METCON Aug. 99
11 MDS, EIA report (final version)
Vol. 1 (executive summary and main report)
Vol. 2 annexes
IUCN / METCON Dec. 99
12 MDS, EIA annexes IUCN / METCON Aug. 30, 99
13 MDS SEIA Quarry sites (Bahunepani, Sera, Chanaute, Timbu and Ribal) supplementary EIA report BPC Hydro consult March 00
14 MDS SEIA 33 KV transmission line (Sundarijal to Ribal) supplementary EIA report BPC Hydro consult March 00
15 MDS SEIA Sundarijal to Gokarna 132 KV transmission line, final report NEA March 00
16 SEIA of MDS based on stand alone water supply only Metcon Const. Nov. 00
17 Scopying report for EIA, WTP, MWSP MHPP/MWSDB Sep 99
18 Scopying report for EIA Nippon Koei Jan. 00
19 Scopying for EIA Mahankal WTP of MWSP MWSDB Aug. 99
20 TOR for EIA, WTP, MWSP MHPP/MWSDB Sep 99
21 TOR for EIA, MWSP Nippon Koei Jan. 00
22 TOR for EIA, Mahankal WTP MWSDB Aug. 99