S.N. Particular Date
1 Bulk Distribution System drawing sheet in ………. Lahmeyer/Motto
2 MWSP, bulk water distribution system, draft, bidding documents for pipe laying and reservoir
construction works section 1 & 2 contract no. BDS/01 and BDS/02 Vol. 1
Lahmeyer May, 00
3 MWSP, bulk water distribution system, draft, bidding documents for pipe laying and reservoir
construction works section 1 contract no. BDS/01 Vol. 3
Lahmeyer May, 00
4 EBD, bidding documents pipelines and reservoirs contract BDS/01 Vol. IV-1 pipeline
drawings, (draft)
Lahmeyer May, 00
5 Contract BDS/01 Vol. IV-2 reservoirs drawings (draft) Lahmeyer May, 00
6 Contract BDS/01 Vol. IV-3 structural drawings (draft) Lahmeyer May, 00
7 Section 1 contract No. BDS/02 Vol. 3 Lahmeyer May, 00
8 Contract BDS/02 Vol. IV-1 pipeline drawings (draft) Lahmeyer May, 00
9 Contract BDS/02 Vol. IV-2 reservoirs drawings (draft) Lahmeyer May, 00
10 Contract BDS/02 Vol. IV-3 structural drawings (draft) Lahmeyer May, 00
11 Bulk water distribution project, draft bidding documents for supply and delivery of pipes & fittings. Contract No. BDS/03 LI/MOTT, Nepal Consult/ MEH April 00
12 Revised draft, contract No. BDS/03 Vol. I May 00
13 EBD, bidding documents for supply and delivery of pipes and fitting contract No. BDS/03, Vol. 2, (draft) LI/MOTT, Nepal Consult/ MEH
14 Draft, Contract No. BDS/04 Vol. I May 00
15 BDS/04, Vol. 2, drawings (draft) LI/MOTT Nepal Consult/MEH
16 Draft, Contract No. BDS/05 Vol. I May 00
17 BDS/05, Vol. 2, drawings (draft) LI/MOTT Nepicon MEH LI/Nepicon MEH Jun 99
18 EBD draft inception report LI/Nepicon MEH Jun. 99
19 EBD draft inception report LI/Mott Aug. 99
20 EDB draft bidding documents for geotechnical investgation works L/Motto Aug. 99
21 EBD geotechnical investigation report Vol. I main report L/Motto April 00
22 EBD geotechnical investigation report Vol. II Appendices (A3 drawings) L/Motto April 00
23 EBD geotechnical report. Vol. III Annex I & II L/Motto April 00
24 EBD geotechnical report Vol. IV Annex III L/Motto April 00
25 EBD geotechnical report Vol. V Annex IV & V L/Motto April 00
26 EBD of MWSP, proposal for consultancy services Lahmeyer/Motto, Nepal
Consultant/MEH
27 EBD of MWSP, hydraulic calculation Lahmeyer/Motto, Nepal
Consultant/MEH May 00
28 Draft engineers cost estimates, contract No. BDS 01 to BDS 05 Lahmeyer June 00
29 EBD, draft structural design report, main report Lahmeyer May 00
30 Land acquisition & right of way plan. Sundarijal Gokarna, Gokarna to Ichok, Ichok to Tigni,
Tigni to Katunje
Lahmeyer
31 MWSDB, EBD design reports L/Motto Oct 99
32 MWSP, engineering for bulk distribution, Monthly Progress Report L/Motto
33 MESP, BDS (draft) prequalification document for pipeline laying & reservoir construction works section 1 and section 2, contract No. BDS/01 & contract No. BDS/02 LAH/Mott, Nep/MEH
consultant Jan 00
34 MWSP, EDB, summary progrress report No. 3 (period 10 Nov. 99 - 9 Feb. 00) Lah/Mott/Nep/MEH consultant
35 Proposed bulk distribution system Lahmeyer
36 Proceeding of workshop on engineering design for BDS Lahmeyer Nov. 3, 99
37 PQ documents (draft) for pipeline laying & reservoir construciton works. Section 1 & 2, Contract No. BDS/01, Contract No. BDS/02 Lahmeyer Jan 00
38 Workshop on EDB distribution mains L/Mott, Nepal/MEH