Pre-feasibility / Technical Assistance
|
|
|
| S.N. |
Particular |
Date |
| 1 |
Brief note on MWSP |
MHPP January 1996 |
| 2 |
Brief on development plan 2020 of the KTM valley |
TDC Sep. 2000 |
| 3 |
Community Water Supply and Sanitation with women's involvement
program (CSWW/WI) |
DWSS, ADB, UNICEF,
Nov. 14-15, 1995 |
| 4 |
Detailed Survey and Design of Melamchi Timbu Ghyanggul
road final report : Vol. 1 |
|
| 5 |
Environmental Impact Study for IBRD, Final report |
Stanley Associates
Engineering Ltd., June 1990 |
| 6 |
Environmental Impact assessment, MWSP |
Balloffet and Collins.
January, 1998 |
| 7 |
Field study and intereaction report |
IUCN, June 24, 1999 |
| 8 |
Greater Kathmandu Water Supply Project Draft Final Report
Vol. 1.1, Engineering &
Economics engineering & economics Appendices A-J |
Snowy Mountain
(SMEC) Nov. 1992 |
| 9 |
GKWSP, Final Report Vol. 1.2B, Engineering & Economics |
Snowy Mountain
(SMEC) Nov. 1992 |
| 10 |
GKWSP, Final Report Vol. 1.3, Hydrology |
Snowy Mountain
(SMEC) Nov. 1992 |
| 11 |
GKWSP, Final Report Vol. 1.4, Geaterchnical Studies |
Snowy Mountain
(SMEC) Nov. 1992 |
| 12 |
GKWSP, Final Report Vol. 6A Environment Appendices A-H |
Snowy Mountain
(SMEC) Nov. 1992 |
| 13 |
General agreement (interim) between HMG Nepal MPPW and
BPC concerning preparatory
works for the MDS |
1998, Aug. 11 |
| 14 |
Hand book for users of consulting services |
|
| 15 |
Hydrological condition and potential barrier sediments
in the Kathmandu valley, Final Report |
Department of mines
& geology & BGR. Feb. 1998 |
| 16 |
Hydrological condition and potential barrier sediments
in the Kathmandu valley, Attachments |
Department of mines
& geology & BGR. Feb. 1998 |
| 17 |
Hydrological condition and potential barrier sediments
in the kathmandu valley, Appendices |
Department of mines
& geology & BGR. Feb. 1998 |
| 18 |
Brief Description of water supply & drainage department
(Nepali convert) |
MHPP Jestha 2056 |
| 19 |
Kathmandu water supply scheme three component package
proposal with reference to MRDS |
O. Hoftun Nov. '97 |
| 20 |
Loan Disbursement Hand Book, June 1996 |
|
| 21 |
Low flow study of Melamchi, Yangri and Larke rivers |
|
| 22 |
MDS, flow measurement and data collection |
BPC, March 99 |
| 23 |
MDS, sediment study, monsoo, 1998 |
BPC |
| 24 |
MDS, draft, hydrology update to August, 1998m M2 |
|
| 25 |
Melamchi river suspended sediment data, 1998 |
BPC, June-Sep-98 |
| 26 |
MWSDB, visitors book |
|
| 27 |
MDS (Melamchi - Timbu road), Pre-qualification document
for the construction of RCC and
steel bridges |
MWSDB |
| 28 |
MHP, Project proposal, first draft report |
BPC, April 97 |
| 29 |
MWSP, report from fact-finding mission |
NORAD, April, 1998 |
| 30 |
MWSP, and NWSC, Financial Analysis Report from fact-finding
mission |
Jan, 1998, ADB |
| 31 |
MWSP, Project Document (Draft) |
HMG/N June 1998 |
| 32 |
MWSP, Project Document |
HMG/N June 1998 |
| 33 |
|
HMG/N June 1998 |
| 34 |
MDS (Phase - 2), Proposal to provide engineering services
& related to continued tunneling
works |
HMG/N March 1996 |
| 35 |
MWSP, loan component project management |
MHPPm Dec. 1997 |
| 36 |
MDS, preinvestment studies draft report |
BPC Hydroconsult,
June 1998 |
| 37 |
MDS phase 2 proposal for engineering and environmental
services proposal no
P/53/034/4/ACW/F |
BPC Hydroconsult,
Feb 1997 |
| 38 |
MWL TOR for international consulting services for MWSP
final report for Melamchi TOR
committee MHPP |
BPC Hydroconsult,
Nov. 1997 |
| 39 |
Project appraisal, management & financial reformulation
of MWL for investment facilitation |
Project research,
management associates May 1996 |
| 40 |
Report on the seminar Melamchi Project implementation
startegy risk analysis for the MWSP |
NWSC/UNDP, March
96, Metier Scendinavia, Nov. 2000 |
| 41 |
Technical assistance to MDS, bankable feasibility study |
BPC Hydroconsult/
Binnei & Partners, Feb., 96 |
| 42 |
Technical assistance MDS, BFS, tunnel design report |
BPC/Binnie, July 96 |
| 43 |
Technical assistance to MDS, proposal for environmental
mitigaiton and monitaring plan,
draft report (Nov. 1996) |
BPC/UNDP, Nov. 96 |
| 44 |
Technical assistance to MDS, environmental mitigation
and monitoring plan, final report |
BPC, UNDP April 97 |
| 45 |
Technical assistance to MDS, project definition report |
BPC, UNDP May 97 |
| 46 |
Technical assistance to MDS, project completion report |
BPC, UNDP May 97 |
| 47 |
Technical assistance to MDS, project completion report
(draft report) |
BPC, UNDP, Dec. 96 |
| 48 |
Technical assistance to MDS, bankable feasibility study
tunnel design report |
BPC, Dec, 96 |
| 49 |
Urban water supply reforms in Kathmandu report on surface
water quantity monitoring works
(dry season) |
CEMAT water lab, May 99 |
| 50 |
UWSR in Kathmandu, report on sludge analysis (Kodku
and Dhobighat WTD) |
CEMAT water lab, July 99 |
| 51 |
Urban water supply and sanitation and / rehabilitation
for Kathmandu valley towns Nepal |
CES, July 26, 1993 |
| 52 |
Water supply for Kathmandu - Lalitpur from outside the
valley |
Binnie & Partners, Aug 88 |
| 53 |
Water resources strategy formulation program Phase 1,
water supply and sanitation (urban)
final draft report |
HMG/WB, Oct, 96 |
| 54 |
Water supply and sanitation (rural) final draft report |
HMG/WB, Oct, 96 |
| 55 |
Water supply and sanitation, hydrology final draft report |
HMG/WB Nov. 96 |
| 56 |
WRSF interim Phase, consolidated Phase 1, study report |
HMG/WB July 6, 97 |