Melamchi Nepali Site
General information
Business Opportunities
Public Notice
Articles
Project Information
Project Information
Social Environment
Image Gallery
Donors
Contact

 

Melamchi Pre-feasibility / Technical Assistance
S.N. Particular Date
1 Brief note on MWSP MHPP January 1996
2 Brief on development plan 2020 of the KTM valley TDC Sep. 2000
3 Community Water Supply and Sanitation with women's involvement program (CSWW/WI) DWSS, ADB, UNICEF,
Nov. 14-15, 1995
4 Detailed Survey and Design of Melamchi Timbu Ghyanggul road final report : Vol. 1  
5 Environmental Impact Study for IBRD, Final report Stanley Associates
Engineering Ltd., June 1990
6 Environmental Impact assessment, MWSP Balloffet and Collins.
January, 1998
7 Field study and intereaction report IUCN, June 24, 1999
8 Greater Kathmandu Water Supply Project Draft Final Report Vol. 1.1, Engineering &
Economics engineering & economics Appendices A-J
Snowy Mountain
(SMEC) Nov. 1992
9 GKWSP, Final Report Vol. 1.2B, Engineering & Economics Snowy Mountain
(SMEC) Nov. 1992
10 GKWSP, Final Report Vol. 1.3, Hydrology Snowy Mountain
(SMEC) Nov. 1992
11 GKWSP, Final Report Vol. 1.4, Geaterchnical Studies Snowy Mountain
(SMEC) Nov. 1992
12 GKWSP, Final Report Vol. 6A Environment Appendices A-H Snowy Mountain
(SMEC) Nov. 1992
13 General agreement (interim) between HMG Nepal MPPW and BPC concerning preparatory
works for the MDS
1998, Aug. 11
14 Hand book for users of consulting services  
15 Hydrological condition and potential barrier sediments in the Kathmandu valley, Final Report Department of mines
& geology & BGR. Feb. 1998
16 Hydrological condition and potential barrier sediments in the Kathmandu valley, Attachments Department of mines
& geology & BGR. Feb. 1998
17 Hydrological condition and potential barrier sediments in the kathmandu valley, Appendices Department of mines
& geology & BGR. Feb. 1998
18 Brief Description of water supply & drainage department (Nepali convert) MHPP Jestha 2056
19 Kathmandu water supply scheme three component package proposal with reference to MRDS O. Hoftun Nov. '97
20 Loan Disbursement Hand Book, June 1996  
21 Low flow study of Melamchi, Yangri and Larke rivers  
22 MDS, flow measurement and data collection BPC, March 99
23 MDS, sediment study, monsoo, 1998 BPC
24 MDS, draft, hydrology update to August, 1998m M2  
25 Melamchi river suspended sediment data, 1998 BPC, June-Sep-98
26 MWSDB, visitors book  
27 MDS (Melamchi - Timbu road), Pre-qualification document for the construction of RCC and
steel bridges
MWSDB
28 MHP, Project proposal, first draft report BPC, April 97
29 MWSP, report from fact-finding mission NORAD, April, 1998
30 MWSP, and NWSC, Financial Analysis Report from fact-finding mission Jan, 1998, ADB
31 MWSP, Project Document (Draft) HMG/N June 1998
32 MWSP, Project Document HMG/N June 1998
33   HMG/N June 1998
34 MDS (Phase - 2), Proposal to provide engineering services & related to continued tunneling
works
HMG/N March 1996
35 MWSP, loan component project management MHPPm Dec. 1997
36 MDS, preinvestment studies draft report BPC Hydroconsult,
June 1998
37 MDS phase 2 proposal for engineering and environmental services proposal no
P/53/034/4/ACW/F
BPC Hydroconsult,
Feb 1997
38 MWL TOR for international consulting services for MWSP final report for Melamchi TOR
committee MHPP
BPC Hydroconsult,
Nov. 1997
39 Project appraisal, management & financial reformulation of MWL for investment facilitation Project research,
management associates May 1996
40 Report on the seminar Melamchi Project implementation startegy risk analysis for the MWSP NWSC/UNDP, March
96, Metier Scendinavia, Nov. 2000
41 Technical assistance to MDS, bankable feasibility study BPC Hydroconsult/
Binnei & Partners, Feb., 96
42 Technical assistance MDS, BFS, tunnel design report BPC/Binnie, July 96
43 Technical assistance to MDS, proposal for environmental mitigaiton and monitaring plan,
draft report (Nov. 1996)
BPC/UNDP, Nov. 96
44 Technical assistance to MDS, environmental mitigation and monitoring plan, final report BPC, UNDP April 97
45 Technical assistance to MDS, project definition report BPC, UNDP May 97
46 Technical assistance to MDS, project completion report BPC, UNDP May 97
47 Technical assistance to MDS, project completion report (draft report) BPC, UNDP, Dec. 96
48 Technical assistance to MDS, bankable feasibility study tunnel design report BPC, Dec, 96
49 Urban water supply reforms in Kathmandu report on surface water quantity monitoring works
(dry season)
CEMAT water lab, May 99
50 UWSR in Kathmandu, report on sludge analysis (Kodku and Dhobighat WTD) CEMAT water lab, July 99
51 Urban water supply and sanitation and / rehabilitation for Kathmandu valley towns Nepal CES, July 26, 1993
52 Water supply for Kathmandu - Lalitpur from outside the valley Binnie & Partners, Aug 88
53 Water resources strategy formulation program Phase 1, water supply and sanitation (urban)
final draft report
HMG/WB, Oct, 96
54 Water supply and sanitation (rural) final draft report HMG/WB, Oct, 96
55 Water supply and sanitation, hydrology final draft report HMG/WB Nov. 96
56 WRSF interim Phase, consolidated Phase 1, study report HMG/WB July 6, 97

© Melamchi Water Supply Project 2002
www.melamchiwater.org